Good morning everyone,
This will be the last entry in this blog as we finally finished our kitchen project by installing our back splash. We are very pleased with the overall project.
Here is a closer picture of our serengeti counter top.
http://www.amfgranite.com/portfolio-post/serengeti.
Louise and I spent about 3 days installing the back splash. One day was spent cutting the tiles and putting them on the wall and two days to grout and clean up.
Below you will find some before and after pictures of our kitchen project.
|
Week#1 |
|
Finished |
We are very pleased with our project and I especially enjoy cooking in our new kitchen. The natural gas range is a dream to work with and I find that the extra counter space is very useful. The kids really like having the fridge with the icemaker. I hope you enjoyed following us in this project and we are very proud of the final product. Not sure what our next project is going to be, a new garage or renovating our living room. One thing is for sure. I plan on blogging about the experience.
Good morning everyone,
Wow, we've been working on this project for 12 weeks already. Thank God we are almost done. I'm looking forward to going back to work. I've missed my students.
This week we completed the installation of our 4 Bostonian doors. Three of them are already varnished. I still need to varnish Julianne's door. Yesterday I installed all the casings, baseboards and mouldings in the hallway. Last night we bought some door handles which I will install tomorrow. The next picture is one of our hallway.
|
Hallway |
Unfortunately our counter top is still not installed. We are hoping to have it in by Wednesday at the latest. I will need to do some plumbing in order to install the sink and the dishwasher.
We also have our natural gas range connected. I'm looking forward to cooking on it. We hope to have our Christmas supper in our new dining room. Have a great week everyone.
Good morning everyone,
Wow, I've been on my parental leave for 9 weeks already. Time is really flying by. This past week we finished up a lot of little jobs. We grouted the hallway tiles and cleaned the haze on the tiles in the kitchen and dining room. I stained the moulding on the North wall and painted the heating grill and air intake. Louise sealed the grout in the floor and I sealed our cultured stone on the North wall.
We finally got our cabinets installed. The installers were supposed to come in on Wednesday but ended up coming on Thursday because of a snow storm. The cabinets look awesome as you can see in the next picture. All that we are missing right now is our quartz counter top. We should get it installed in a couple of weeks.
|
Cabinets |
On Saturday we received our appliances. So far I installed the fridge and microwave. This week I want to install the water line to the fridge and get the natural gas installed to our range. The next picture shows our kitchen with some of our appliances installed.
|
Appliances |
This week we are supposed to receive our Yukon table and finish installing our cabinet lights. In addition we are getting a corner basket installed in one of our cabinets. I also hope to install the chandelier that goes over the table. It's going to be another busy week. Have a great week everyone.
Good morning everyone,
This week has been a busy one again. Louise finished taping and putting mud on the walls in the kitchen. She did an awesome job. In addition she painted those walls. We were lucky to have Jinny's help on Friday. The picture below shows our project so far.
|
Project - Week#6 |
I installed a fan in our bathroom which took most of a day. It was hard to get the hose through to the soffit but in the end everything worked out fine. We plan on remodelling our bathroom soon.
We had a lot of rain last week which slowed me down quite a bit. I like to setup on my deck to work when its nice outside. If it rains I have to cut all of my pieces in the shop which is about 75 feet from the house. I tried putting a tarp on our trellis but it was raining so much that the water was collecting on the tarp and was leaking on the deck. I'm still trying to come up with some way of keeping the rain off the deck. The next picture is the hallway with the knotty pine.
|
Hallway |
We receive 2 of our 4 Bostonian doors last week. The other 2 were damaged in the wearhouse. I should get the other 2 doors in 4 to 5 weeks. I'll probably install the doors at the end of the month once we have our tiles in.
I also installed the cement board on the wall in the dining room. We are still waiting for our cultured stone to come in. I figure it will take us a couple of days to install. Hopefully we will receive our cultured stone by the end of this week.
This week I'm hoping to get the knotty pine on the ceiling and install the cultured stone on the dining room wall.
We have 2 weeks left before the guys come in to install our cabinets. We hope to have everything done on time. Have a great week everyone.